Geology control at excavation of the Stanjevci tunnel

Authors

  • Tomaž Beguš
  • Klemen Sotlar
  • Robert Hoblaj
  • Mihael Brenčič

DOI:

https://doi.org/10.5474/geologija.2002.024

Abstract

Railway tunnel Stanjevci between Murska Sobota and Hodoš in northeastern part of Slovenia passed Pleistocenne soil layers: sand with gravel, silt and clay in subhorizontal orientation. The construction problems in tunnel arised due to some parts of liquid sands and low bearing capacity of saturated contact between clay and sand layers. In article we compare geological cross-section from investigation phase with cross-section after contruction phase. We found greatest difference in orientation of layers because of discoloured weathered clay layers.

Downloads

How to Cite

Beguš, T., Sotlar, K., Hoblaj, R., & Brenčič, M. (2002). Geology control at excavation of the Stanjevci tunnel . Geologija, 45(2), 305–310. https://doi.org/10.5474/geologija.2002.024

Issue

Section

Articles

Most read articles by the same author(s)

1 2 3 4 5 6 7 > >>